delays.

To improve circuit efficiency, it was decided to establish

an electronic relay system of operation at Hawaii during those crit=ical periods when the direct circuit operation was not satisfactory.
An electronic relay was necessary because of the on-line SIGTOTSAMSON crypto system emplcyed.

TG 7.5 concurred in the proposal

and USARPAC agreed to provide the electronic patch facilities and

equipment.

OCSigO-FAPUSJCEC (Frequency Allocation Panel, U. S. Joint

Communications - Electronics Committee) was requested to provide a
full complement of high frequencies for the operation of the circuit.
Since it was not intended that the direct Eniwetok-Los Alamos circuit

and the patch system would be operating at the same time, it was
recommended that the same frequencies assigned to the direct circuit
be used for the electronic patch system,

After installaticn of the

patch system, a continuous seven-day test showed that this system
provided about twenty-two hours daily usable circuit time as compared
to only six hours daily on the direct circuit.

Az a resuit of this

performance the electronic relay system was employed continuousiy

for the remainder of Operation CASTLE.

|

Initially all the Bikini Atcll facilities providing inter-atol
voise and teletype commmications ware located at Eninman sinze the
bunker on Enyu which would eventually house this equipment had sct

been completed at that tine.

Oa 16 January 2954, ali TG 7.2 facii~

ities were moved to the bunker on Enya except for a. small commurication center retained on Enirman,

Numerous operating diffisraities

were experienced following the move to Enju for the space in the

Select target paragraph3