CPCS
~ 2.
other agricultural crops sampled.
The Bikini survey will be conducted
over a period of about eight days.
The major objective of the Eniwetok radiological survey and cleanup study
will be to collect further information on the present radiological condition of the islands, which will assist in planning for another extensive
survey tentatively scheduled for August/September 1972.
In general, the
survey will emphasize the islands which have been least damaged or contaminated by nuclear testing and would be most habitable.
include
This will
radiation surveys and collection of soil, vegetation
and animal samples where appropriate and time allows.
The Eniwetok survey
will be conducted over a period of about seven days.
The itinerary for the FY 1972 Bikini and Eniwetok surveys is as follows:
Arrive
Honolulu
April 29
Leave
Honolulu
May 1
| Arrive
Kwajalein
May 1
Leave
Kwajalein
May 3
Arrive
Bikini
May 3
Survey of Bikini Atoll
Charter plane
May 3 - May 10
Leave
Bikini
May 10
Arrive
Eniwetok
May 11
Survey of Eniwetok
MAC
KMR - LCU
May 11 - May 17
Leave
Eniwetok
May 17
Arrive
Kwajalein
May 17
Leave
Kwajalein
May 19
Arrive
Honolulu
May 193
Leave
Honolulu
May 20
lS
MAC
MAC