wenn snt:
; . “DECLASSIFIED PER
DOE
Engineers - Constructors
.
mt
LETTESz DATED JU
LY,
i5,
FROM ANTOR SINTSGALLY4. 19874
‘TO. *
TO: General Superintendant Do me JOB: O42 | DIANE S. NIXON
FROM: ‘andi
onein : Lotte 7 4 “ ‘RBs -
weiter Station Generators 7 3
Tana ig Septenber 1957
TONNE
Your1memo of 21 June’ 1957 has ‘been well: considered and every effort.
--' ~ to, complete designs, based ‘upon using 60KW, 3-phasegenerators whenever
QO .
+
a available has’ ‘been made. Wehave purchased a limited number of these
60 KW,°3 phase generators because we were under obligation to use the
ont
DOD furnished 15 EW generators we haye on hand, wherever vossible.
I have delayed answering | your memo until final designcould be firmed
up. It now appears that at most of the. stations we will use one 60 KW
' generator and the day use of only one 15 kw generator with another
60 KW as standby for both.
«
. EHWs: jm
cect J/S Chrono
J/S Central J
ngineering© -
/s Engineering Reading F‘le
NATIONAL ARCHIVES
REPOSITORY SACIEIC spy THWES TT REGION
COLLECTION RG 326 ATOMIC ENERGY Commission
BOX No. 22670 (#24) Alb él
FOLDER WEATHER AN)
326 -6SB873¢
RAQSALE: STATIONS
OFFICIAL
.