Department of Energy

Pacific Area Support Office

ATG.

SrmMBbOL

DIR
TNITIALS/BLG,

was/>

AOS2O7

FO. Box 29939

Honolulu, Hawaii 96820

DATE

10/23/78

OCT 24 1978

RIG.

Sya@sBOL

—

INITIALS SIG.

Commander
Field Command

Defense Nuclear Agency
Kirtland AFB, NM

&7115

RIG,

Dear Sir:

SYMBOL

INITIALS / erg,

COORDINATION DRAFT ANNEX Y TO DNA OPLAN 600-77

(DEMOBILI ZATION)
DATE

?

2.

-

Concepts
RTG.

The subject of transition of law enforcement procedures from the
present TTPI-DNA agreement to whatever arrangement is contemplated
after April 15,

1980, needs to be addressed.

BrMBOL

}- — -—_-

There have already

been preliminary discussions held between TTPI (Scott Stege) with
the CJTG.

In addition the Chief of Police of the MarsShalis, H.

Watring and Judith Knape, MLSC Attorney,

Wally

have initiated correspondence

RIG.

SIMBOL

concerning the assignment of an additional TTPI police officer for

Japtan (not an H&N employee).

.

IMNdTIALS/ SIG

What is needed is a time phased agreement between TITPI and DNA
on how and when the TTPI will assume the functions of both the
Court

and Law Enforcement.

RIG.

The law enforcement arrangement which existed during the pre-mobilization phase of Enewetak (with the H&N Resident Manager and the Safety
Officer also serving as TTPI police captains) is not feasible for
even the period 15 April 1980 to June 1, 1980.
It would appear that
one solution might be for the TTPI to agree to assume the Court and
Law Enforcement functions full time on April 15, 1980, with a reasonable period of redundancy before that Gate during which time the
H&N/PTD people now performing these, functions could “phase in" the
people assigned to these tasks by the TTPI.

BYMHOL

EMITIALS/ SEG

DATL

ATG.

SIMBOL

INITIALS/SIG.

Appendix 3 to Annex Y, Page Y-3-3

RIG,

4.

Responsibilities

Peas / HIG,

a.

DATE

AS communications capability is reduced during the final phases
of demobilization the problem of "coordinating" all demobilization
resources by FCDNA will increase as will the volume of. decisions.
It would appear reasonable to assign some level of authority to

the CJTG to authorize disposition of resources.