(3)

Provide three (3) 5-36 aircra’t for control, effects and samp-

. ling missions for U~Day.
Operations Order 2-54)

(4)

(See Annexes G, I, and K, TG 7.4

Provide one (1) B-47 aircraft for an effects missions on

U-Day.,

(See Annex J, TG 7.4 Operations Order 2-54).

(5) Integrate the operations of three (3) B-50 aircraft into U-Day.
(See Annex 0, TG 7.4 Operations Order 2-54).

(6)

Assure adequate sample removal procedures for U-Day.

Annex R, Task Group 7.4 Operations Order 2-54).

(7)

(See

Augment the field maintenance facilities of the Test Support
Unit as required,

(8) Provide for complete care, storage and issue of personal
equipment to all aircrews of the Test Aircraft Unit,

(9)

Prepare the marshaling plan for all aircraft which will depart

from ENIWETOK to participate in U-Day, and special missions.

(10)

be

Prepare a post-mission parking plan for all aircraft that will

land at ENIWETOK after the completion of their mission,

(12)

Prepare a mission execution chart and assure that take-offs

(12)

Provide for aircraft decontamination,

Test

and landings are accomplished as specified in Annex C,

S

’

(1) Provide three (3) C-54 photographic aircraft and crews for
U-Day.

(2)

(See Annex L, TG 7.4 Operations Order 2=54),

Execute assigned missions, inciudine that specified in Annex A.

(3) Provide adequate SA~16 and other required SAR support to the

AOC and CIC for operational: control throughout the U-Day event.

(See Annex F, TG 7.4 Operations Order 2-54). Additional SA-16

aircraft for back up purposes may be obtained from Test Support

Unit.

(4)

Provide adequate WB~29 Weather Reconnaissance, cloud tracking
and sampling services throughout the U-Day event.

M, TG 7.4 Cperations Order 2~54).

(5)

(See.Annex

Assure adequate pre-missjon weather forecasting aa‘ required
for the U-Day event.

(6) Provide necessary weather briefings and weather reports to
the CIC and AOC throughout the U-Day event,

(7). Assure adequate communications facllities throughout the
U-Day event,

(8)

Augment the field maintenance facilities of the Test Support
Unit as required.
.

(9) Coordinate with Test Aircraft Unit to assure tht Test Services
Unit aircraft are marshaled as required by that unit.

(10)

TASK GROUP 7.4

Provide for complete care, storage and issue of personal

equipment to all aircrews of the Test Services Unit.

sep

oo

OPRS ORDER NO. 6=54
v

2

sie930
rf

9

Select target paragraph3