©
~
Ge Toot Supporttatsee
a
(1) Assure that: transient traffic and ‘airlift «operations do not
>
dnterfere with. or endanger‘jtest aireraft operations during
the UpDay, evente ©"Bee bonex A, 16.7.4 Qperatione Order 2=54)6
(2) |“Provide“two (2)“CnQ7 aircraft for.var relay for the U-Day |
missions” (See Annex F, 1G 7.4 Operations Order 2-54).
@) “Establish regiirea measures to prevent movement of vehicles
.
frem interferfing with or endariggring oir operations throughout U~Day. * 3 ;
(4)
.
{
.
Provide adequate crash removal and fird fighting protection
“for ail. air operations on U-Day.
.
a?) ‘Place one’ (2): H-19 helicopter under:“theoperational control
>
of the SAR Element Commander and’ one (1!) ‘erash. boat under the
-
operational control of the AOC from 27 February 1954 and con~
_ tinuing throughout the project.’ (See Annex
A
F, 1G 7.4 Operations Order 2-54)»
;
(6) 2 Assure ‘adequate refueling and field mai} tenance support for
yall ‘aireraftduring the U-Day event
(7)
Provide’“photographic coverage during Use operations for.
' historical: PUTPOBES»
°
i
(8) vIncoordination with other Test: tilts, assure adequate trans- portation schedule from the flight line to the dining halis
and bidleting’ areas throughout the. U-Day event,
: | (9) ‘Roordinate with Test Aircraft Unit to desure. that 0-47
‘
REFLECT. aireraft are marshaled -‘as r
uired by that unit...
(10)“Make ‘avellableone airlift SA=16tothe TestServices Unit
“.
* for additional rescue capability, if rpquired.
He ALL Tatty -
So Po
ay. Provide 1Maigon officers to ‘assist Healiquarters TG a4 aire
craft’.controllers in the A0C, on the Command Ship and. Control
ase
as* required. (See Arinexa
Teh Operations Order
. 2-54 e
°
.
(2). Coordinate with Test support Unit.
t
to a
dining schedules, in-flight lunches, %
for the*“UrDay mission,
(3)
4
.
Adhere to security procedures as outlined in Annex G, Security
and Public Information, TG 7.4 Operations|Order 1-53.
(4). Emphasize the Flight Safety Program outlined in Annex L,
Flight Safety, TG 7.4 Operations vee1-53 and other directives,
(5). Be prepared to augment existing SAR fepslittes in cnergencies
during the UaDay event.
-
.
(6)
Be prepared to” postpone’ execution of
the'mission for such
periods as are made necessary by adverse weather or other
=e events.
2-54).
:
at
~
.
-
ak
TASK GROUP 744° --.
_ OPRS ORDER NO. 6~54
ri
(See Amex v 7G 7.4 Operations Order
gos
oe
OM
~
I:
sy
a
sos
ven
40