D. Mavhew I. Adler otBahae J. Bagley De Lorenzo R. Conaway M. C. Shannahan AL APR Go 7 19dt I. Linger Larshall] Islancs iclated Projects to ve Trenslerrc? froec the Biloic-ical and Evvirorrental heseearch Pro;rar in the Office of Enervy Research to the Assistant cecretary for Enviroaientei Protection, Saiety, anu Loergency Preparedcnecs flex Gs Frerlins, Acting Aseistant Secretary for Unvironrental Protectior, Safety, and EP oh | Eunerzency Preparecness MaVher 349) /E Irn accordance with the recently; ennounced cepertrental organtzetion which traneferred the Siolopical and Unvirontental Reseerch (LER) prosrar fror. ER tue forner Office of the Assistant Secretary for Epnvironrent to the Gifice of Enercey Research ([%), a review of “nonresearch"™ ilarshall Islands related activities has been macee As a result of this review, a nuiver of projects Pewitt have been identified which, because of their "nonresearch”™ nature, should be , / transferred into the nev Office of the Assistent Secretary for Environrental Protection, Sefety, and Evergpency Preparedness (4°52P). These projects inelude activities related to the medical surveillance of Marshall] Ialands infabitants and Spanish inhabitants who may have been exposec to radietion fror: weapons testing or accidents involving nuclear weapons; and activities concerning dose reasseserent and radioclocical surveys of the tarshall Islands, lievada test site fallout in the Soutlwest, and related projects-s CH 3/BIk Attachrert 5B identifies projects currently located in ASIP which, in conjunction with those projects listed in Attachment A, comprise e unified prorrane Upon receipt of your concurrence, appropriate action will be talken, in accordance transfers to the Assistant Secretary for Environrertal Frotection, Safety, anc Enerrency Preperednesse Final arranperents rezardcire transfer of personnel included in the recently announced departrental organization will be concluded in the necr futuree Ne Douglas Pewitt, Acting Director Office of Energy hesearch 2 Attachnents AGRELt ‘ (s[A. Lsaslinag DISAGREE! DATE: ccs C. Edinet “4 3/ £1 EP: RDe Lorenzo:mvm: 353-5590: 3/31/81 P, Marshell’ Ryan, CR~-1 W. Heffelfinger, AD-l ark 5p [i Attachment A to this menorandur: icentifies the specific projects which should transfer fror ER to ASLF. with procedures te be issued by the Controller’s office, to effect these 78