.
o AC e

“

400809

A

ATOMIC ENERGY COMMISSION

fe} AS
ere

NEVADA OPERATIONS CFFICE
P. Cc, BOX 14100
_AS VEGAS, NEVADA 89114

UW

aie

ee
tase
RagSpa eE
SS e
!
oie AO recAl
wT
Te

tee Bw
soy Tay

SU

45794

ML Le ee

a
Rs

VY

y

i

r

1°

ok ens

an

oy ett

AdeFcere a ee
ee
vias
Maj. Gen. Edward B. Giller, USAF
Assistant General Manager for Military Application, HQ
BIKINI CLEANUP PROJECT
There is attached for your information a memorandum forwarded to us
by the Manager, HAO, covering items discussed with the Commander,

JTF-8, at Bikini Atoll on March 2.

You will note on Page 3 the statement that General deSaussure was
extremely critical of H&N's failure to develop a detailed plan for
cleanup. This situation came about as a result of the fact that the
original estimate and plan were developed over very short period of
time, and that at the time of the meeting there wasn't yet a local

understanding as to what the program actually required. This is now
being rectified through definition by the Trust Territory of what
is to be done and how it is to be accomplished, and a plan is now
being worked out to the satisfaction of all parties.
)

PDB: KNJ-149

KSL. CPiice be
aie
Miller

‘Manager

Enelosure:
Memorandum from J. R. Johnson,
General Manager, Pacific Test
Division, H&N, Dated March 10,

1969 (c/DI)

cc:

W. A. Bonnet, Mgr., HAO,

Honolulu, Hawaii, u/o. encl.

ran

weeS Dorated fromPa Sait, hawtle Mes

document es

(ir i
-lAse I EY ED
ere TS

tr?

Select target paragraph3