aa
Gust and overpressure iatea was r.ct recorded due to premature
shutting down of the recoriing instrum-ntation.
Preliminary eet imate
of gust is 45 to 50 percent of allowable limit.
‘verpreasure is
estimated a °
a
42
3
gs ope
a
tetSik
COPY
t