>. 74
wa
ail
yh)
Progect F.L7 2 Tneemea> Mux tn? tibets Meaeu-om te Prom Afreraf? Tart RL OT. Deaceoe
OpseeT
The obilective of Prafect © .7 mrtintemtion an this shot waa to
ottain thermal fling andl albeto fafoemition 7f 9 nuclear detonation
with airborne calorimeters, r.lfor-ters, and sixteen millimeter motion
Pi-ture cumerac,
INSTANT ATION
Instrumentation within
the purview of Project 5.7 which was ine
stalled in the 9647 include? rinetecn TIL ealordecters ant teo MIPL
radiometers for measuring the
raifation.
Mrect ant surface -efleste! + ecmal
Six calorimeters vere utilised to mezsurs thermal radiation
which was back-scattered towar? the cscxsit.
Sever GSAP S~} cameras
were utilized to shtain photocrachic coverage cf che fireball, the
wearth's surface, ani of clovit> beneath she eaireratt, ani also -* any
reflecting curface such asa slol whith could contribite to the baakBrattere] raiflation.
Project £.7 instrumentation on the Be5? Incluie? the baste 2] ine
struments for thecal radistion messurements, but on’y an atiitional tro
instruments vere utilize? for backescea’’‘er neasurement-,
Sirht CSAP
Cameras were installed for pi.cto-raphic coverage,
Project. 5.7 instrumentation on "hs Rel? sonsicte:
of the basic
twenty one instruments ant six camecsa.
Project 5,7 ins*rumentition on the %66 coreqrte! a%
twenty one instruments ant tect eo sims
Neither tactical howhe: (P-°£, UST) mo instrumented for measuring
E COPY
L
B
A
L
I
A
V
A
T
BES