ma
-
.
“
103
Aye
ae
Project 21.2 - Sampling - FP. Betsel
The Air Poros Special Veapones Center supplied two F846 and three B-57
to take samples on this device,
Aircraft
Time after arot
Alt Collected
043
1.50 - 2.30
42
3.84 x 102
049
495
502
1.45 - 7.30
2.00 - 2.30
2.15 = 7.45
42.5
bs - 50
51 - 53
3.57 x 1029
9.32 x 102°
3.04 x 10°?
500
2.45 ° 3-15)
52
2.52 x 1018
Heures
Fission
Pilet Radiat-
The cloud ‘oR 2000 torped at 85,000 fcet and the baze was et
30,000 feet.
The sample sise on this device wos large enough for all measurenents
necessary.
The success of the somling was due to the cooreretion and interest
shown by the Air Force personnel.
= 101 -