Radiolopical Safety CUIF SEVEN No, 3-53 b. Provide complete allowances of RiDIAC equipment and special clothinEe The requirements of CTG 7.5 will be included in the allowances of CIG 7,1 for necessary issue to TG 7,5 personne] during the operational phese and for subsequent loan or sale to CTG 7.5 for post—operational use at the Pacific Proving Ground. . c, Prior to the first shot minus 10 days, forward to CIG 7,1 (for use of. radiation the RADSAFE CENTER in conjunction with film badge/dosage control) a list to whom film badges will be issued during ing of TG personnel/parttetpetintedn the overseas phase of the operetion, Within five days following each shot, provide CTG 7,1 with additions xz Ssietitona to previous lists, Lists will indicete full name, rank or rate, serial or service number if applicable, and home station or laboratory as appropriate, De The Commender, TG 7,1, having the major technical radiological safety unit, will: a. Perform all ground monitoring services essociated with scientific missions except those in conjunction with aircraft and airborne collec= tion of scientific data, b. Provide laboratory services and technicel assistence to ell task groups, to includes (1) Provision of standard type film badges and specified supplenentary items of personnel radiological safety eqauiment. ; (2) Laboratory services to develop end interpret film badges, (3) Records of exposures from film badges. (Duplicates will be furnished tesk group cormanders), (4) ‘Laboratory services for the radio-chenical analysis of woter DOE ARCHIVES serples, (5) Provision of primary facilitics at P.RRY ISL.ND radiologicsl safety building for calibretion, repair and maintenence of instmments N3

Select target paragraph3