Po PY BABY?
7

fo?

me

oo

oy

409748

repositoryAitifCthhk
convection aah, Yt -5/
BOX No. job

rower 3L9./

(NN3- 32b -93-06 )

(7-23-47)

kit Tore, v7

~": 564th AEC

--. Meeting
* Sn29m51

15. AEC 129/31, 129/32, 120/23, and 1290/3 - Progress Report to

the Joint Committec

Under consideration was the draft

_8

.

Progress Report

to the

/

Joint Committee on htomic Energy (AEC 129/31, 129/32, and 129/33)

~

together with a draft Foreword (129/34).

Specific revisions to

the report and a suggestcd account of the MTA projects were discusscd.
~
ge

After further discussion,

the Commission:

a. APPROVED, with revisions indicated at the meeting,

the Progress Report (AEC 129/31, AEC 129/32, and AEC
192/33) and Foreword (AEC 129/34) to the Joint. Committee
on Atomic Energy; and

b. REQUESTED that the revised account of the MTA
projects to be inserted in Part II of the Report be
circulated to the Commissioners prior to submission of
the Report to the Joint Committee on Atomic Energy.

(Mr. Glennan, consulted on the following day, advised
of his concurrence in the above action.)

NCELED
NS
N CA
SSIFICATIOCA
IEW E.0. 12958
REV
ON
TI
CA
FI
SI
ASN
OL
DECL
DE
ST
NN-$23

eI NE GARNER
ee
DOE
HER
Bi: KAT

DOE/

THIS PAGE ONLY

SECS

-

Select target paragraph3