Po PY BABY? 7 fo? me oo oy 409748 repositoryAitifCthhk convection aah, Yt -5/ BOX No. job rower 3L9./ (NN3- 32b -93-06 ) (7-23-47) kit Tore, v7 ~": 564th AEC --. Meeting * Sn29m51 15. AEC 129/31, 129/32, 120/23, and 1290/3 - Progress Report to the Joint Committec Under consideration was the draft _8 . Progress Report to the / Joint Committee on htomic Energy (AEC 129/31, 129/32, and 129/33) ~ together with a draft Foreword (129/34). Specific revisions to the report and a suggestcd account of the MTA projects were discusscd. ~ ge After further discussion, the Commission: a. APPROVED, with revisions indicated at the meeting, the Progress Report (AEC 129/31, AEC 129/32, and AEC 192/33) and Foreword (AEC 129/34) to the Joint. Committee on Atomic Energy; and b. REQUESTED that the revised account of the MTA projects to be inserted in Part II of the Report be circulated to the Commissioners prior to submission of the Report to the Joint Committee on Atomic Energy. (Mr. Glennan, consulted on the following day, advised of his concurrence in the above action.) NCELED NS N CA SSIFICATIOCA IEW E.0. 12958 REV ON TI CA FI SI ASN OL DECL DE ST NN-$23 eI NE GARNER ee DOE HER Bi: KAT DOE/ THIS PAGE ONLY SECS -