ATOMIC ENERGY COMMISSTON
TEST SCHEDULE ~ REDWING, DIXIE
Report to the General Manager by the Director
of Military Appi ication
1. In view of the present status of developmental work in the
laboratories, it is considered advisable to revise the test program
previously. visualized for the remainder of this year and calendar

year 1956,

Whereas previous plans included conducting DIXIE at

the Nevada Test Site during the latter part of 1955,

it is now

considered necessary in order to maximize the benefits of the
tests proposed,

to integrate that test program with REDWING which

will be conducted in early calendar 1956 at the Pacifie Proving
Ground as was originally planned.

Our plans to combine the

detonations which were previously to be included as a continental

series in DIXIE are dictated by the laboratories! requirement for
more time after TEAPOT to design the Gevices and prepare for the
associated diagnostic programs,*

Recent suggestions that all

testing be accomplished at the Pacific Proving Ground have not

influenced our decision in
2,

combining DIXIE with REDWING,

The present concept is that the next test series after

REDWING will take place in calendar 1957.

The decision as to

whether it will be conducted as a continental or overseas test will

*¥Note:

AEC 757 circulated to the Commission contains Dr. Bradbury's
views on deferring DIXIE.
RESTRICTED DATA
This document contains restricted data as

defined in the Atomic Energy Act of 1954,

Its transmittal or the disclosure of its
contents in any manner to an unauthorized
person is prohibited,

;
a

Select target paragraph3