EXCERPT FROM MINUTES OF SEPTEMBER 7, 1972, INTERAGENCY
MEETING ON THE REHABILITATION AND CLEANUP OF ENEWETAK ATOLL
AtC
AcC noted that the location and removal of noncontaminated debris
should not be separated from location and removal of contaminated
ebris.
A precleanup survey covering both radiological and

engineering aspects would be required and tentatively was being

planned for late September.

AEC would fund the radiological aspects of this precleanup survey,

the conduct of any other radiological survey activity that might be

required to understand conditions in the environment as they relate to

exposures of people and developments of standards, and the conduct of
periodic followup radiological surveys that take place after cleanup.
lf later field and/or laboratory work is done by AEC in support of
‘cleanup, AEC should be reimbursed by DOD.
DOD

DOB would be responsible for funding the engineering portions of the

precleanup survey and those monitoring and survey activities that

are required to support cleanup operations and to insure safety of

personnel involved in cleanup activities.
DOD also would fund the
later cleanup of both radiological and nonradiological activities.
DO! would be responsible for funding rehabilitation costs once

cleanup was completed.
Bot

For the benefit of Mr. Cardwell from OMB, DO! proposed that appro-

priations for both cleanup and rehabilitation be separate and not

included in overall ceilings.

pepartment

‘Cneray
of Energy

's Gitice

Historian

S

ARCHIV E

Your proposal is heard but there is no way to give you any reaction
on that today.

:

ENCLOSURE 1}