wathV (FLATHEAD)

DP

Project 2.10 =~ Verification of Washdown Effectiveness as a Shipboard
Radiological Countermeasure - M, M, Biggers

'

Objectives

Operation of YAG's and LST to be stationed in fallout area
RadSafe support for NRDL Projects
Washdown evaluation
Procedure and Results - Ship Operations

The project ships, YAG=39, YAG-40, and LST-61l, successfully completed
their mission on the

FLATHEAD) shot.

Precise information in ships

position and other operational information has been given Project 2.63 for
inclusion in their reports,
YAG-

"

erations

YAG=39 encountered fallout at 1030 of D-day (12 Jume).

At 1100,

when the gamma radiation intensity had increased by 2 mr/hr, the ship
was closed and washdown activated.

The radiation level peaked at 1800,

Deday, with an intensity of 140 - 150 mr/hr. on the unwashed deck forward,
and 10 = 14 mr/hr on the unwashed deck aft,

was 8.4 mr/hr.

Peak intensity on the bridge

Fallout apparently stopped at the same time it peaked (1800).

Washdown was secured at 1950, the ship partially opened at 2115 and complet-

ely opened at 2400.
YAG-LO Operations:

YAG-40 encountered fallout (i.e. a 2 mr/hr increase in gamma radiation intensity) at about 1415 on D-day,

Watch was transferred to the

bridge and the ship closed except for several hatches,

When the radiation

intensity reached 20 to 30 mr/hr at 1600, the engine room hatch was closed
and the washdown system was activated,

COPIED DOE
bate RO

- 39 -

Peak intensity occurred at about

aU

Select target paragraph3