Letter of Instruction - Ujelang Mission
DATE: February 12, 1958 |
SO
' You are hereby designated as senior member of all personnel of the H&N
group to be engaged in the survey required .by Project 34.4, while such
personnel are shore on Ujelang Island.
oe
As such, you will have the authority to:
Replace existing survey markers with concrete monuments, make
distance and angle measurements between monuments as shown in'
the drawings and specifications, direct the offloading of a
DUKW and the operation of same ashore.
Establish and administer rules and regulations pertaining to
personnel conduct while ashore which will insure continuing
good relations with Trust Territory and native personnel.
: The MV Aloto will depart Eniwetok on or about 12 February; off~load the
DUKW with survey personnel, materials and equipment aboard and remain
“Luntil survey program is completed.
Thereupon, the MV Aloto will depart
Ujelang on or about 14 February 1958, at 1700 hours; arrive at Eniwetok
at 0800 hours on 15 February 1958.
"Your group will consist of the personnel listed on the attached.
wpaivroing
BEST COPY AVAILABLE
“eo: AEC, EB (2)
Gen, Supv., Industrial Relations
Gen. Supt., Construction
Gen. Supv., Communications
Gen. Supv., Service Operations
Gen. Supv., Supply
Office Manager
af
Resident Controller
Resident Engineer
WATONAL ARCHIVES
REPOSITORY PACIEIC Sou THWESE REGION
COLLECTION £6326 ATorIC EVEREY COMMISSiOW
BOX No, 2EE22 (#28) Alb/l6y
FoLDER
Chief Timekeeper
J/S Chrono
J/S Central
OFFICIAL USE ONLY
MEATHER
_S FATj0ws
326-656 730