Nine holdings of eR
eOlh TED
a
tR
Pacific Sout}

SHEET 1

HOLMES &NARVER, Inc.
ENGINEERS-CONSTRUCTORS

,

gee

“ee

#

ake

NEED Be

10

ESTIMATING FILES

sor:

FROM:

C. «be
L, EAST

SCIENTIFIC STATIONS
STATIONS
_ re,SCIENTIFIC

_

Sa,

f

¢

7 fe, Boe \ @ G%

DATE:

2
OF
AOSP BO

FEBRUARY 25,

Ree
Moff

1953

>
S

4
=

>|
3

This memorandum shall constitute exerpts from Restricted Data, letter received
from Robert H. Campbell J6, Los Alamos, addressed to Field Manager, Eniwetok,

3
~

8 elq Office, Albuquerque, New Mexico, H & N file #721 which briefly outlines
uthe facilities required on Job 884.

at}

fs

Eo

NP

WS

22

“t}

2

yl

Item

Fz

XS}

s}Item 2 - This will be located on George and will serve the same purpose

2S

Xf

EP

RAP
SEP

oy
uf

EPS
y . 5

6

= 3 S| Item

&

Xls

|

4

xX

Item

similer to Ivy, station 301, without Ivy station 805.” The
height of this tower may be anywhere between 75 and 125 feet.

te 24

Engineering Division, for comments and suggestions on the
the part of the user,
5 — This will be a recording station on NAN and general size
will be approximately that of Ivy station 520.
6 ~ This will be a recording station on NAN similar to Ivy station
520.

There is a possibility that the final design may in-

corporate in one structure items 4, 5, and 6, and if so, this

structure will be heavily reinforced and secured against water

on
oS
oe
id)

|
|

.

This tover willbe.” bey PGF”

Preliminary sketches have been prepared by Holmes & Narver

Item

i
D
.
ASSIFICATI ON CANCELLE
De
6. CLAS SIFIED INFO BRACKETED

SIFIeED INFO
Wear
2 CONTAINS NO DOE CLAS

t CLASSIFICATION RET AHNE
CLASSIFICATION CHANGED TO:

&

|

rn

general land mass.

3 - This will be a tower required on HOW.

Bitem 4 - This will be a timing end communication station on NAN.

@
SINATe WITH: _.LT

OC

EW
DECLASSIFICATION REVI
DEPARTMENT OF ENERGY
A(S)]
NUMBE
LE
{CIRC
N
NATIO
TERMI
DE
BY:
.
D

x
wi

$§

3

e

sions, this station will be surrounded by water even to the

extent of its construction on the tip of the island and afterwards, the cut of amoat, isolating the structure fram tie

ape e

EO
6
uo

This structure will

aa Ivy, Station 300, With the same general interior dimen-

SIS y

<P

of Green House, station 6A and 6B.

be of very heavy construction,

xa}
sy

1 - Constitutes a structure on Fox of the approximate size

ys}

and other contaminating features as well as being dehumidified.

Iten

7 ~ This item will be a 300 foot tower comparable to Ivy station

Item

& - This will constitute a small camp on NAN.

Item

9 - This shall be located on Roger by UCRL similar to Ivy station

301 and 805 and Ivy station 6 combined.

The size of this

camp will be dependent upon the requirements or guesses of J-1
ag to the number the camp will have to accancdate,

200.

Cab

|

Item 10 - ae will be a eampat ground level on the west end of Tare by
UCRL.

Item 11 ~ This item will comprise a pipeline of UCRL'S, which will run

between items 9 and items 10.
Item 12 - This item will be required by UCRL and will be located on Uncle.

It is assumed that this structure might be similar to item number
2 on George.

The above 12 items constitute the latest known scope of work on the part of Robert
Campbell, but Mr. Campbell states that none of this work is to be considered as firm
until projects are approved and officers assigned to each project.
SJ = ini : YINFORMATION:
;

“This material contains informistion affecting the
nations: defense of the United States within the mean-

‘np of the espionage laws, Title 18, U.S.C., Secs. 793

and “24 ihe transmission or revelation of which in any
100M 5-52 Mas

manner tn ae ucayiorized person is prohibited by law.”

Select target paragraph3