Project
Sumber

‘Project

Organization | Officer

Title

PROGRAM 12 - REACTION HISTORY (B. Watt)
a

12.1

7

12.2

_

UCRL

[History

Telemetered Time Interval

12.3

\

‘History

5. Colgate

J-16, LASL

Watt

g-16, LASL

Watt

“D6

PROGRAM 13 = PHOTOGRAPHY (G. Felt)
13.1

Bali of Fire Photography

EG&G

H. Grier

13.2

Cloud Photography

EG&G

H. Grier

13.3

Bhangmeters, GR Slit Cameras, Etc.

EG&G

Grier

13.4

High-Speed Photography

J-15, LASL

Feit

Time Interval Measurement with

J-15, LASL

Felt

°13.5

Bowen Cameras

PROGRAM 14 = EXTERNAL NEUTRON MEASUREMENTS (C. Cowan)
1h.

J-12, LASL

Threshold Detectors

Biggers

PROGRAM 15 = ALPHA MEASUREMENTS (N.H. Smith)
15.1

Teller and Scintillation Alpha

1S. a

ELECT eam AENWETIC

BLPIR

J-13, LASL
LASL

PROGRAM 16 = GAMMAS AND RESIDUAL CONTAMINATION

6.

(B. Watt)

Gamma,

16-1 FROGR AY ainMceounnoceneny¢or a4, nebine)
17.4

Mi Cre0 BHR OG APN

SANA

PROGRAM 18 = THERMAL RADIATION (H. Hoerlin)

JM Plan on &

18.1

Time Interval Between Reactions

NRL

H. Stewart

18.2

Power va Time

NRL

H. Stewart

18.3

Spectroscopy

NRL

H. Stewart

18.4

Air Transmission and Resolution

NRL

H. Stewart

18.5
149 /

Total Thermal Radiation
NRL
H.
PROC LAA 19. /OAbINE SVeley Laveen Levasoser)
law ine

Svevey

linn, er basen.

aaa" LAB,

Stewart

A Powe Osow

3498

Select target paragraph3