al
“re Led‘aron

weapon progress.

>

~2=

Any alternative plan such as postponing a portion

of the shots until the Pall of 195), would be uneconomic and harmful

to either the immediate "energency capability" program or future

progress in the field of thermonuclear weapons.

The earliest feasible date for scheduling the start of the CASTLE

tests 48 March 1, 195). This is based on the rate of supply of
lithium-6, the time required for fabrication, shipment, and assewDly

of weapon components, and the sched:les for construction of test
sites and installation of equipment at BIKINI and ENIWETOX, work on
which is underway in both places,
Reports prepared by the Division of uilitary Application, Los
Alanos Ecilentific Laboratory, and the University of California
Radiation Laboratory, Livermore, are enclosed as background information relative to the CASTLE program and for detailed inforvation
relative to the weapon prototynes and test devices to be exploded,
Appended to the Los Alamos report are possible production schedules
for the emergency capability period. These schedules are being
reconsidered in light of the recently received Joint Chiefs of
Staff's reqiirements for therinonuclear weaponSe

In summary, CASTLE plans are as follows:
The scope of the program willia tests of the

b.

The first test will be schediled for “erch 1, 195h,

and the sequence, exact dates, and locations of the various tests
will be Ceterm’ned by the Comnancer of Joint Task force Seven
in conjunction with the Los Alamos and UCRL-Livermore Laboratories.
Assurance of the Department of Defense support of this very
important program is requested.

Lewis L. Strauss 99«

Chairnan

co

..

SoA,

Enclosures:

et

wa" © CAETLE Prorram Background,

® Discussion prepared by D4A, Cpy lA.

orm = Rpt, 9/22/53, fra IASL, Cpy 15

a

j te

.

to ead

ONT ate
"cn = Spt, 9/21/53, frn UCRapte ene
Cpy 13

*

7.

3

a

ge
o

\

Select target paragraph3