RGprodudedWadia
Tow
tre
gOUr WheNational Archives
Pacific Southwest Region
Hw OT RSSIFLED PRR DOR
RRA: ERBsmy
Povty.
3/13/57
UL,
LS,
1994
:
E.O.
Llla AMON LerSLUTSG
mae ol tet ae
ALLE To
:
YF
wee wee
2.
winsoD
i”) GS.
tT
ei
98,
Rev.
2
Page ¢
HEE
The plen for the four new weather stations is to be based on the Tarawa plan,
with minor exceptions, namely:
a.
oO
Move entennas so that not more than 150' of drop-lead to the Operations
Building No. 5 is necessary. The antenna can be directly over the building
if required.
b.
Iflove the latrine from the barracks building to the day room and provide a
shed for Laundry facilities.
These instructions supersede the design requirements for weather stations in
paragraph 3 of JIF-7 letter. The Rad-Safe Station is still to be similar to.
the Wotho Station.
3.
Review the generator capacity at the existing stations to ascertain if it is
sufficient to carry the additional load of the ice making machine and electric
grill requested in paragraph 7 of JTF-7 letter.
required make provisions in your estimate.
If larger generators are
"Therefore, you are requested to prepare an estimated construction schedule which
will show the number of days required after notification of availability of funds."
Teletype reference (C) is quoted as follows:
"HOHNER TO SANDERS INFO LT COL WALTER A GRAY.
REF MY LTR ETE:FWH-3l)3 DATED FER 26,
1957 IN REGARD TO WEATHER AND RAD-SAFE STATIONS.
DUE TC MISINTERPRETATION OF
REQUESTED CCMFLETION DATE DISREGARD FIRST SENTENCE OF NEXT TO LAST PARA AND ALE OF
LAST PARA OF LTR.
PROVISIONS WILL BE MADE FCR FUNDING OF CONST IN FY 195€ PUDCET
NCW UNDER PREPARATION.
REF ETE: FWH-3)5"
Authorized for Engineering
and Designs
4.
1.
Fred W. Hohner
2 “.
AEC Contract Reprdsohtative
Hh
S. P.
Howell
Project Manager
2 Blin
R, R. Alvy
Engineering tlaneper
(For Distribution, see Page 3)
OF USEONEY
£.0. 98, Rev. z