c. Test Support Unit: (1) (2) yo? Assure that transient traffic and airlift operations do not interfere with or endanger t.st aircrait operations during N-Day Event. Establish required measures to prevent movement of vehicles fron intorfering with or endangering air opcrations throushout N-Day. / (3) Provide adequate erash reroval and fire fighting protection (4) Place one (1) H-19 helicopter under the operationz] control for all air “operctions on N-Day. of th SAR Element comander and one (1) crash boat under the ‘operational control of the AOC from 27 February 1954 (See Jimnex *, TG 7.4 | and continuing throuchout the project. . Operations Order 55h). (5) (6) (7) Assure adequete refueling and ficld meintenance support for all aircraft during the it-Day Event. Provide photographic coverage during.Day onerations for histarical purposes, - 4 In coordinction with other Test Units, assure edocuste trans- portation schedules fron the flight. line to the dining halls ang billecting areas throughout the N-Day Event. ' x AU Units 3 (1) -. Provide liaison officers to essist Heedqucrters TG 7.4 cir- craft controllers in the 40G, on the Commend Ship and Control Destroyer as required, (See Annexes 5, T and U, TG 7.4 Operations Order 5-54). (2) Coordinate with Test Support Unit to crrange required early dining schedules, in-flight lunches, transportation, etc., for the il-Dey Event. - (3) Adhoreto security procedures as outlined, in Annex G, Security and Public Information, TG 7.“4 Overations Order 1-53.- ' (4) Emphasize the Flight Safety Progren outlined in Annex 1, Flight Safety, TG1h Cperations Order. 1-53 and other ~ directives, (5) Be prev rod to augnent existing SAR f: ectlities in energoncies (6) Be propered to postpone exccution of the mission for- ouch periods as are made neccossary by adverse weather or other unforeseeable events, (Soe Annex V, TG Ted Operations Order 5~54). . . (7) Assure proper reporting of radiation encountered by maltiengine aircraft. (See Annex W, 7G Toh Operations Crder 5-54). (¢) during the: K-Day Event. | (9) Conduct bricfings as required. Order 5-54). (See Annex K, TG To4 Operations Immediately after aircreft lend, maintenance personel vill - clear all dicrepencies 1s soon as possible so as to insure “the atreraft is ready for enother mission 4f so directed, TASK GROUP 74° « _ OPRS ORDGR NO, 7~54

Select target paragraph3