c.
Test Support Unit:
(1)
(2)
yo?
Assure that transient traffic and airlift operations do not
interfere with or endanger t.st aircrait operations during
N-Day Event.
Establish required measures to prevent movement of vehicles
fron intorfering with or endangering air opcrations throushout N-Day.
/
(3)
Provide adequate erash reroval and fire fighting protection
(4)
Place one (1) H-19 helicopter under the operationz] control
for all air “operctions on N-Day.
of th SAR Element comander and one (1) crash boat under
the ‘operational control of the AOC from 27 February 1954
(See Jimnex *, TG 7.4 |
and continuing throuchout the project.
.
Operations Order 55h).
(5)
(6)
(7)
Assure adequete refueling and ficld meintenance support for
all aircraft during the it-Day Event.
Provide photographic coverage during.Day onerations for
histarical purposes,
- 4
In coordinction with other Test Units, assure edocuste trans-
portation schedules fron the flight. line to the dining halls
ang billecting areas throughout the N-Day Event.
'
x
AU Units 3
(1)
-.
Provide liaison officers to essist Heedqucrters TG 7.4 cir-
craft controllers in the 40G, on the Commend Ship and
Control Destroyer as required, (See Annexes 5, T and U,
TG 7.4 Operations Order 5-54).
(2)
Coordinate with Test Support Unit to crrange required early
dining schedules, in-flight lunches, transportation, etc.,
for the il-Dey Event. -
(3)
Adhoreto security procedures as outlined, in Annex G,
Security and Public Information, TG 7.“4 Overations Order
1-53.-
'
(4)
Emphasize the Flight Safety Progren outlined in Annex 1,
Flight Safety, TG1h Cperations Order. 1-53 and other ~
directives,
(5)
Be prev rod to augnent existing SAR f: ectlities in energoncies
(6)
Be propered to postpone exccution of the mission for- ouch
periods as are made neccossary by adverse weather or other
unforeseeable events, (Soe Annex V, TG Ted Operations
Order 5~54).
.
.
(7)
Assure proper reporting of radiation encountered by maltiengine aircraft. (See Annex W, 7G Toh Operations Crder 5-54).
(¢)
during the: K-Day Event.
|
(9)
Conduct bricfings as required.
Order 5-54).
(See Annex K, TG To4 Operations
Immediately after aircreft lend, maintenance personel vill
- clear all dicrepencies 1s soon as possible so as to insure “the atreraft is ready for enother mission 4f so directed,
TASK GROUP 74° «
_ OPRS ORDGR NO, 7~54