2&0
Ae
osse
9
ITEM DAY
se8
ooreo
v
S
cv) oe .
eer
_—
.
TASK GROUP 7.4 CHECK LIST
HOUR
.
EVENT
lo
NL
2
Ned
0900
3
Ned
2600.
Publich Task Group 7.4 Operations Order 7-54,
4
Ng
1900
CTS 7.4 ‘reports state of readiness of TG Teh
to CJTF SEVEN.
5
Ne3
0800
Project participants arrive ENINETOK.
6
N~3
1800
CIC scope controller assignmmt charts prepared,
7
Na2
0700
JTF SEVEN official observers arrive at ENIVETOK,
8
N-2
0800
9
N-2
0900
‘
.
.
0700 ©
Three (3) "B-29 Veather Reconnaissance missions
per day begin.
Positioning meeting at Hg Task Group 7.1 to firn
positions of all aircraft for ico"? evedtt,
CJTF SEVEN notifies CINCPAC relative to closing
and reopening of ENT'JZTOK airstrip, .
'
10
N-2
1000
;
ll
NA
1200
Ne
1300
12
.
aoc confirms requirements for post mission, interatoll airlift operations, Notify. CIC of aul
confirmed. missions.
Mission flinsies issued to all aircrews by Test
Aircraft Unit.
,
“Two forecasters from Weather Central board
USS FSTES,
Required radiological instruments issued by Test —
Aircraft Unit B36 and Be29 Radiological
Directors.
;
‘13
N-2
1300
u
N-2
1300
Test Aircraft Unit designates mission tower officer.
15
co,
Ne2
1600
Three (3) sample return aircraft (FLY“AWAY 1, 2, and
3) arrive at ENIVETOK,
16
Ne2
1600
17. 1"
.
p70
18
N-1
19°
NL
20,
Nel
‘21
Nl "|
TASK GROUP Teh
cic checks Time Hack communications.
‘Three (3) B50 IBDA aircraftarrive at INIWETOK
from GUAM.
:
Radio and_ IFF checked in these acft.
_ AOC insures that tower personnel are rebriefed
on N-Day mission,
;
Test Support Unit. insures that crash removal
crews are briefed and prepared for N-Day
assignments,
Test Support Unit insures that final arrangements
are made for messing and transportation during
the mission,
0730
OPRS ORDER NO. 7-54
ANNEX A
.
Aircraft Status Report submitted to CIC by AOC.
AOC submits full "Midnight Report"by 0800.
stg!@
%
-—