as mans as four GJTR instruments. The project control panel recorded the receipt of al] H—S-rirnu
signals and could manually be set to lock out the EG&G signal or arm the project relai system anliore-~
set al] project relays.
The triggering systems were Similar on the three target ships.
BEST AVAILABLE COPY