2.

A plan for the Aomon crypt, considering that:
a)

Walls collapse when dug to a depth greater than 6 feet.

b)

Estimates of the depth of the crypt range from
15-30 feet.

c)

Retaining walls will have to be built in order
to dig out the crypt.

d)

The channel is 25-30 feet deep.

3.

Remove soil >80 pCi/gm from Aomon; this will take it down
to <40 pCi/gm.

4,

Remove soil from Enjebi--JTG started at the areas of highest
concentration.

Thus far they are down to~45 pCi/gm.
They anticipate the removal of a large soil volume in

order to get down to 40 pCi/em.

What is the practical difference between 40 pCi/gm and

45 pCi/gm?

5.

A plan for the refill of the Pace crater site.

6.

Removal of soil from Runit on a noninterference basis.

7.

To stockpile contaminated soil on Runit in 3 piles:

>1,000 pCi/gm
160-1,000 pCi/gm
<160 pCi/gm
VII.

Roger Ray then discussed the status of each of the islands being
cleaned-up.
Boken

Nesting sooty terns are holding up work in the area.
Surface contamination levels are highest at the area where
there is subsurface contamination.

They expect to get to~40 pCi/gm.

Select target paragraph3