1. As Commander Joint Task Group 8&8. I am responslhle for complete
documentation of the Bikini Cleamip Project. I have been furnished
detailed ingtrustions for eompleting a work list data sheet that when
commeted must £100 any historieal or legal documentation requirement.
A copy of the instruction sheet is enclosed.
Ze It is requested that HSalmes and Narver, as part of this project,
determine the necessary information and complete the wrk list data
sheets with accompanying modified plot plans.
3.
It is necessary that we have close coordination in preparing these
liste.
Specifically, Holmes and Sarver
d obtain all information
for columns; two (2) Locations; three (3) Stetus at start of project;
eix (6) Final Action. Based on personal reconaiesance, study of avail-
able plot plans, and consultation with the AEC Representative and yourself, 1 will furnish te you the information required for columns; one
(1) Item; four (4) Planned Actions five (5) Reamrks.
4. All manmade structures (e.g. bunkers) thet will remain in place at
the completion of the project will have thelr overall dimensions ineluded in columm 3.
5.
On all plot plans a title blook will be printed that includes
appropriate title related to this project, date and signature of the
person responsible for preparing the plot plan.