and operation of such physical security safeguards at the Pacific

Proving Ground for conformance with AEC and Task Force security policies.
Provide security representation for TG 7.5 elements afloat and

furnish personnel in security servicing capacity for elements of
TG 7.1 afloat.
Maintain liaison with security personnel of Headquarters, JTF

SEVEN, and other Task Groups to assure adequate coordination

of matters of mutual interest.

(21)

Assist in the preparation and execution of security aspects of
TG 7.1 documentary and technical photographic controls plans
at the Pacific Proving Grounds.

(22)

Monitor the storage, handling, and destruction of classified materials and documents in accordance with AEC standards.

(23)

Function as Top Secret and Classified Reference Control Offiand as Top Secret authenticating official for SFOO-AEC interests at the Pacific Proving Ground.

(24)

Function as EFO Accountability Officer with responsibility for
preparation of monthly SF materials balance report and for
preparation of certificates of expenditures of SF materials

during tests at the Pacific Proving Ground.

(25) Notify CJ TF SEVEN of the current TG 7.5 clearance (except

Holmes & Narver) status and furnish CJTF SEVEN,after the
operation, a clearance status report of all Holmes & Narver

participants,

(26)

Prepare the security annex to TG 7.5 field and administrative
orders and assist in the preparation of the security annex to
TG 7.1"s operation and administrative plans.

(27)

Assist other Task Groups of JTF SEVENin all other security
matters when so requested.

E-3

(1)

In coordination with TG 7.1 ascertain and submit TG 7.5 requirements for ships, boats, and aircraft to JTF SEVEN.

(2)

In coordination with TG 7.1 collect and analyze total requirements for housing and'personnel transportation, submit re-

quirements to JTF SEVEN and Task Groups as appropriate,

and assist in solution of related problems as necessary.

(3)

Coordinate space utilization, including quarters, public spaces,

warehouses, etc., to accommodate fluctuating requirements of
various Task Groups and to assure most efficient utilization of
available space.

Select target paragraph3