Operations Plan - Mission No. 10 FY 1979
Page 3

3.

Insure one medical trailer installed on starboard side of
Ship and whole bedy counting components are aboard by
August 17.

4.

>.

Insure all BNL and vessel cargo is identified and put aboard

vessel.

Same with gift food per phonecon with PASO.

Identify and make available a vehicle (4 x 5 pickup or van)
for BNL use.

6G.

MAC arrangements back to Hono.

7.

Arrange to have portable generator,

8,

Linens, etc. for scientific bunk quarters.

9,

Vit.

and electrical cables on board.

16MM movie projector

Insure 2 whalers, 2 drums pre-mixed outboard gas and 2

drums diesel aboard.

FUNDING

Program charges for this mission are to be recorded against
BNL

Ix.

(Nat

Greenhouse)

purchase order with

Holmes

& Narver.

REPORTS
The Party Chief and the DOE/PASO Representative will prepare and

circulate mission reports within 30 days after completion of

the operation.
Specifically, as agreed at the Livermore scheduling
meeting of July 24th, the reports should be circulated to all DOE
and contractors involved.
In this case reports should go to
Drs. Wachholz, Weyzen and Pratt, Roger and Bill Stanley.

ae

5 0 | | n q 4
wi

Select target paragraph3