overseas phase of the next operation.

The recreational facilities and supplies of recreational equipment such

as fishing gear, equipment for tennis, handball, and water skiing, all appear

inadequate during an operational period.

If it ts not possible to increase the

supplies of such items maintained by TG 7.5, JTF 7 should allocate funds to
augment the supply of recreational gear during operational periods or subordinate units should arrange to supply their own personnel.
During Redwing and Hardtack a few persons from TG 7.1 were permitted to visit other islands in the Marshall, Gilbert, and Caroline groups
as passengers on official trips to project sites. These visits were highly
regarded as a welcome change from life at the EPG. It is urged that in
future operations the opportunities for such trips be expanded so that most

persons on extended tours may be able to leave the site for a few days of
recreation.
J-3 Section, Plans and Operations.

Communications - For future

operations, it is recommended that the base consoles (20-watt transceivers

with line termination equipment) for the major nets be installed in one central location at each respective site. Increased usage of "remote” units
from the base consoles should be made in lieu of base transceivers whenever possible. The consolidation of base console stations will assist the
maintenance and security problems,
The switchboard operators at Eniwetok and Bikini Atolls controlled
the ciphony calls satisfactorily during normal operations. However, it is recommended that an additional small switchboard be installed in Building 204
on Nan to handle the special ciphony calls during an evacuation phase.

The use of "mobile" radios was very slight.

It is recommended for

future operations that portable pack sets be used whenever the need arises
instead of installing "mobile" in all vehicles.
In order to protect scientific electronic equipment, it is recommended
that modern mobile electronic countermeasure equipment with specially
trained operators be provided at each atoll of operation.
Air Operations

1.

mission.

Conclusions:

a.

The airlift provided was adequate to support the scientific

b.

Administrative devices such aS the TCA imposed unwieldy

b.

The TG 7.4 operations personnel and TG 7.5 dispatch per-

procedures on a purely operational requirement for airlift between scientific
stations.
c.
Control and dispatch of aircraft supporting the scientific mission is most effectively executed at the place where the mission requirement
is generated.
d.
Maximum use of scheduled airlift provides the most satisfactory service.
2.
Recommendations:
a.
Inter-island airlift at Eniwetok should be considered as an
operational matter and should be arranged by norma! staff action between
operating and using headquarters. The TCA should not be concerned with
operational requirements for helicopter missions any more than he is with
requirements for B-36 missions.
sonnel with proper facilities for control and dispatch of aircraft supporting
inter-island airlHft should be at Elmer. Since they are there on —1 and
116

AFWL HQ

WS

Select target paragraph3