fe aD‘f f H rn rt ve g- vi? ROP DECK: Pope i fe my a e . } f sit a “ : fod : Noted the following tentative schedule of reports developed by the Department of Defense in consultation with the Special Assistants to the President for National Se- curity Affairs and for Science and Technology, pursuant to NSC Action No. 1841-b. To be submitted approximately January 30, 1958: (1) Report on whether decisions should be made now: (a) To produce additional first-generation ICEMs beyond the 130 currently programmed, to be operational prior to the end of FY 1963; (ov) {c) (2) (3) To build additional launching sites required to make operational any additional firstgeneration ICEMs so produced; and To harden such additional launching sites. Report on whether to order now production of more than 3 Polaris submarine missile systems; and on possible further acceleration of production. Report on whether to install interim defense against ballistic missiles attack at SAC bases, utilizing modified available anti-aircraft missiles. To be submitted approximately March 15, 1958: (4) Presentation of Department of Defense plan for national-level study relative to capabilities of forces for limited military operations. To_be submitted approximately April 1,1958: (5) Report on whether to accelerate early warning radar system for ICBM attack by advancing the operational dates (a) of long-range tracking radar at the Thule Station from December, 1960, and (b) of the stations inAlaska and Scotland from December, 1960, for the warning radar, and from December, 1961, for the tracking radar. (This report will be submitted prior to April 1, 1958, if the Department of Defense needs author- ity for such acceleration at an earlier date.) {6) Report on: (a) Whether to accelerate the improvement of SAC reaction time against an enemy bomber attack and against an enemy ICBM attack; 1 AEP) gem, - 16- CROAT ee Ea RP de oe Sa eel deaty, Se Ge ee A ceopr

Select target paragraph3