a
'
ea
(2) -Position two (2) - Actual time crc establishes contact
_ and accepts control from'i.00 (approximetcly 50 miles
:
. from ENIVETOK at designated gontrol point outbound). .
- (3)
Position three (3) - tetual tino atreraft errives at
assigned mission station,
(4)
yO
~~
.
Position four (4) + Letual time eireraft+aparte mission
.
station,
(5) - Position five (5) + Aotual time LOC esteblishos contact |
and accepts control from CIC.
(Approximately 50 milos
at designated control point Anbound) .
(6)
:
and
gt
Position six (6)-- hotuel time. eircreft: lends.
a
‘
Se Plotting wild be the responsibility of the Status Controller _
through his assigned plotters and tellers. . Aircraft will be plotted from -
-
position one (1) to position two (2) and from Position five (5) to posix. oo
. tion six (6) at three minute intervals from positions receiyed from the ©... *
. AREA Controllers scope, After aircraft dopart position two (2) they will
cr plotted by one arrow with time and call signas told forward from the.
IC, .
i
Do
*
.
“£. “SAR missions inthe ENIWETOK area willbe conducted as set -
my
forth in imnex "F" ond will be controller from the hoc O68 ‘directed in ne
"Enorgency Rescue Operating Procedure (400),
ho.
‘
omg
:
—_
PAUL H. PACKLER -
_ Lt Colonel, USAF
ue
,
Me 1
~ oes
Me
ve
.
.
“
7
oe
en .
i
.
: as
wh
re
wee
.
' Director of Operations -
USK GROUP, 76h
ae
:
*
vs
oO
2
HOWELL i. ESTES, JR.
- Brigadier Goneral, U, So. Fe
.
Commander wee
9 We
a
oy
we BE ae
2 pg TE
Lor
ag
.