Page 7, Line 10
fron bottan

Page 9, lins 10

fran botton

Page 9, line 9

from bottan

Page 9

to

tamination, to make better use af the limited

q@mount of real estate available, and to speed

wp the tests by schedmiling assembly operations

Page 10, line 3

Page 10, lines 2
fron bottom
Page 11, line 10

positions that would insure that DOD Project

602 odtain the required data.

Select target paragraph3