William R. Gooper, MV «3- December 5, 1969 1l, ARC sad BOD construction-type equiguent returned to J. A. ead to Bamon Trect has been carefully faspeeted. Equipment returacé to JA. is being repaired for current M60 and construction requiremsate. AEG equipment returned to Damon Tract is not being repaired pending éetermingtion as to whether or act AERC has any further need for it. 12, The projected final cost of thie office's participation in the program is $900K. This figure tncludes repair of equipment at J.A. as well ac the estimated replacement cost of commnication equipment. Total funds available sre $1,030K. Thus, there is an tadiceted underrun of §130K. In this connection, and as noted above, & con- siderable emount of AEC equipment was left at Bikini Atoll for the TT. Aa a part of this arrangement DASA promised to replace all of the ARC equipment -- estimated to have a replacement cost of $200K. Before the $120K underrun is released, the matter of the $200K worth of equipment should be resolved with BAGA. ORIGINAL SIGNED BY WILLIAM A, BONNET William A. Bonnet Sirector EP-1669 ce: W.D. Guith, Jr., Aset. Mgr. EBL, WYOO x Aili. ay CONN aa viowk 77 YC =e) ore @ is Kee mabye AS we re ow an‘ ioe OFFICE pm SURNAME p DATE ® Form |... wee eelee eee ee ee ee eee ee ee ce eee doe ee eee penneeee eee eee |.__._ en wee ene eee ne eee ee ee ee [...._.----. 2dee eee fee ee eee ~818 (Rev. 0-53) U.S. GOVERNMENTPRINTING OFFICE : 1966-~O-214-€29 eee eee ee