William R. Gooper, MV

«3-

December 5, 1969

1l, ARC sad BOD construction-type equiguent returned to J. A. ead
to Bamon Trect has been carefully faspeeted. Equipment returacé to
JA. is being repaired for current M60 and construction requiremsate.
AEG equipment returned to Damon Tract is not being repaired pending
éetermingtion as to whether or act AERC has any further need for it.

12, The projected final cost of thie office's participation in the

program is $900K.

This figure tncludes repair of equipment at J.A.

as well ac the estimated replacement cost of commnication equipment.

Total funds available sre $1,030K. Thus, there is an tadiceted
underrun of §130K. In this connection, and as noted above, & con-

siderable emount of AEC equipment was left at Bikini Atoll for the

TT.

Aa a part of this arrangement DASA promised to replace all of

the ARC equipment -- estimated to have a replacement cost of $200K.
Before the $120K underrun is released, the matter of the $200K worth
of equipment should be resolved with BAGA.
ORIGINAL SIGNED BY
WILLIAM A, BONNET

William A. Bonnet
Sirector

EP-1669

ce: W.D. Guith, Jr., Aset. Mgr.
EBL, WYOO

x Aili.

ay CONN aa
viowk 77 YC

=e) ore @ is

Kee mabye AS
we re

ow

an‘ ioe
OFFICE pm

SURNAME p
DATE ®
Form

|... wee eelee eee ee ee ee eee ee ee ce eee doe ee eee penneeee eee eee

|.__._ en

wee

ene eee ne eee ee ee ee

[...._.----. 2dee eee fee ee eee

~818 (Rev. 0-53)

U.S. GOVERNMENTPRINTING OFFICE : 1966-~O-214-€29

eee eee

ee

Select target paragraph3