f, All pilots, and al2 AOC, CIC and SAR personnel will be respoisible for a detailed knowledge of all information outlined in thts Annex. g- The Commander, Test Services Unit, will be responsible for providing SAR briefings to all participating 7.4 aircrews. h. The Commander, Test Support Unit, will place one (1) SAR helicopter and one (1) Crash Boat under the operational control of the AOC from 27 February 1954 and continuing throughout the project. 2. SARPLAN: ae SAR aircraft will be identified by the voice Call Sign | STABLE 1,2,3, and 5 and by CW Call Sign 7DV 1,2,3 and 5, as appropriate. Call signs of all project aircraft and stations are specified in Appendix 3 to Annex "D", Operations Order No. 1-53, and in Annex "E", this order. STABLE 1,2 and 3 are SA-16 type aircraft, STABLE 5 is a Helicopter. be STABLE 1,2 and 3 will carry aecro-medical technicians, who will also function as radiological monitors. Reference: Paragraph lle (3), page Hl-3, Appendix 1, Annex "H", Operations Order No. 1-53. ce. During operational periods, control and coordination of SAR aircraft will be exercised by the Air Operations Center (AOC) until such time as positive control is accepted by BOUNDARY TARE (CIC aboard the Command Ship), in accordance with the provisiona of Appendix 1 to this Annex. a. One (1) SA-16 will be maintained on continual airstrip alert (ground) during the entire project. e. One (1) H-19 or H-13 helicopter will be maintained on continual airstrip alert (ground) during the entire project. f. One (1) Naval AVR Crash Boat, Voice Call Sign GUNSHOT ONE (1) will be maintained on continual SAR alert in the ENIWETOK Lagoon during the entire project. g. Inspections and periodic maintenance of SAR SA~16 aircraft will be performed at KWAJALEIN by the 78th Air Rescue Squadron. h. The SAR Element will bring a thirty (30) day flyaway kit of aircraft spares, with resupply from AF 714 SO, Hickam AFB, through the METS Service Stock at KWAJALEIN. i. Resupply of the SAR Element will be the responsibility of the Commander, Test Services Unit, Provisional, through AF 714 SO, Hickam AFB, and the MATS Service Stock at KWAJALEIN. j. Applicable personnel supply and administrative procedures are those outlined in Annex "C" and pertinent appendicies of Operations Order No. 1-53. k. SAR Element training will be accomplished as outlined in Annex "F", Operations Order No. 1-53 and in this Annex. . 1. Matters pertaining to. Security will be found in Annex "G", Operations Order No. 1-53 e.g: Security Clearances, Classification Criteria, Photography, etc. TASK GROUP 7.4 OPRS ORDER NO. 1-54 ANNEX "Fr r2 ee