ACOee
HOLMES
op
ay
-
-
5
&
NARVER, INC.
ponent tar neernenns
enna
io
ee ee
re
ENG INEERS-C ONSTRUCT ORS
828 South Figueroa Street
LOS ANGELES 17
U. S&S. ATOMIC ENERGY COMMISSION
Contract No. AT-(29-2)-20
21 January 1958
Dr. Lauren Donaldson
Director, Applied Fisheries Laboratory
University of Washington
Seattle 5, Washington
Subject:
SHIP SUPPORT FOR APPLIED FISHERIES LABORATORY
BIOMEDICAL PROGRAN
Dear Dr. Donaldson:
The Director, Pacific Operations Division, ALO, has concurred
in the recommendations set forth in our letter dated 10.
January 1958 relative to integrating the ship requirements
of the Marine Biblogical Program with the schedule of the LSM
444 currently being operated by Holmes & Narver, Inc.
Present planning indicates that the schedule for the vessel
would be most pliable after mid-August 1958.
Preliminary in-
formation concerning your anticipated requirements would be
appreciated at the earliest possible date.
The recommendation has been made by the Director, Pacific
Operations Division that your Laboratory submit a formal request to utilize the vessel through the Division of Biology
and Medicine, U. 8. Atomic Energy Commission.
Sincerely yours,
BEST COPYAVAILABLE
HOLMES & NARVER, INC.
C. W. Kelley, Manager
Construction & Facilities
cc:
Mr. F. W. Hohner, AEC/LA
Mr, Joe B. Sanders, AEC/ALB