bof de / HOLMES & NARVER, INC. Engineers - Constructors TOs Engineering Manager JOB: FROM: Resident mngineer()| RE: 94,2 \ Mt AV J/S No. 1263 “ \ . yi 0 7 en Fuel Tank Inspection, Site Fred bol Farn DATE: “ye & March 1959 i/ ftw Submitted herewith for your information and future planning are the results of an inspection survey of fuel tanks in the POL Farm, Site Fred, made on 2 March 1959. Tank numbers referred to are as shown on drawing PS-2437. Tank 411490 feete Interior: Bottom is in excellent condition. Metal is clean under the existing plastic film. No apparent rusted areas, Sidewalls are in good condition. Metal is generally clean under coating with some lightly rusted areas. penetration from inside out. Exterior: No apparent Top of tank is generally rusted with heavy rusted areas, Sidewalls All bolted joints show heavy have scatteredrust boils with some penetratien. rusting under protective paint. Tank appears to have approximately 1/8 inch wall thickness. extensive sand blasting inside and out. Will require Horizontal Tank No. 32 Interiort Very good condition. Plastic coat is blistered and peeling but metal has not rusted very much. Bxterior: Light rusting in scattered areas. Heavy rust blistering. Mo apparent penetration. Rusted areas are Heavy Head seams generally rusted. very general and corrosion is moderately advanced under aluminum paint. pitting evident from previous sand blasting. General rust is approximately 1/16 inch penetration. Boils appear to penetrate approximately 1/8 inch. Vent pipe is heavily pitted. Tank appears to be constructed of 1/4 inch plate. sandblast, Will require extensive Horizontal Tank No, 31 Interior: Same as tank No. 32. Exterior: Very heavy rusting on both ends at bottom exterior. pitting on top, sides and ends. Vent pipe is moderately pitted. Rust boils amd Tank appears to be constructed of 1/4 ineh plate and will require extensive sandblast. Horizontal Tank No, 30 Interior: Good. Light rusting. Plastic coat blistered and peeling, Kcterior: General pitting and rusting. One hole is evident at west end of tank on bottom side, Vent pipe is lightay pitted. Tank appears to be constructed of 1/4 inch plate. Will require extensive sandblast.

Select target paragraph3