Reproduced frongyt¢wioldist da HOLMES & NARVER, Inc. ENGINEERS-CONSTRUCTORS _ TO: Chief of Operations rrom:__Ng¥sy 0/0 Division sop. 884 sg,PISCALYEAR1954 BUDGET ~~ PLANT AND EQUIPMENT nae. March 20, 1953 necessary switchgear and transformers. not ineluded in estinate. ) 1, 2. A@ditional 1,000 kw generator with switchgear Procure and lay cable $ 158,000 346,000 Subtotal (Note: (Thia second generator $ 504,000 The work desoribed above has been modified considerably by an engineering study which will be submitted for approvel of the Field Manager probably this week. The engineering study and estimate of cost will include additional work on the Elmer and Fred distribution systems not noted above; however, the changes will provide mich needed capacity to the distribution systems, and it is believed the work can be accomplished for about the same amount of money as estimated above. It is expected the Field r will approve this new electrical distribu tion plan approrinately Procure and construct an eluninum bu of approximately 12,100 square feet area, equipment to be furnished by "military services, 1. Procure and construct 12,100 sq. ft. © $15,00 Subtotal (Note: Operational $131 600 $ 181,0C0 Engineering will prepare plans for this building for ap- proval of the Field Manager.) Herenouees Procure and construct two 40' x 180! and one 40! x 100' prefabricated alwainun warehouses similar to those reoently constructed on Elmer, 1. Procure and construct 18,400 aq. ft. 4 914.42 Subtotal Total item il (Note: «$= 260,000 $ 260 ,COo & 945,060 Col. Sackton was advised at the Jobsite that the Army should firm up their warehouse requirements to indicate ake 5 ia ™~ — rm { mrs —