3. Navy will allow AEC to contime using the Marine Biology Laboratory now located on Parry Island and to contime staging from EPG periodic medical-ecological studies of the possible effects of fallout on Rongelap Atoll. Navy will provide logistic support, on a reimbursable basis to those AEC and AEC contractor representatives making ‘such use ef the Laboratory and staging such studies. 1e~anea-oFt betweenee Z. ay —these— at suck times as Ldent—or A Bernt rs ae Tse--~-$e-—-tr1e-e4-4 AEC agrees to provide a periodic radiological survey of EPG and to advise the Navy of radsafe problems in these areas so as to protect the Government of the United t&tates. Costs for surveys specifically requested by DOD will be borne by DOD. 5. Pending a determination by AEC as to the contimance of the AEC Facilities Division, H&N, Inc. Los Angeles (the AEC prime operating contractor for EPG) AEC and Navy will, effective July 1, 1960, each essume and pay an equitable share of the overhead costs of such division. The Commander, Pacific Missile Range for Navy and the Manager, Albuquerque Operations Office for AEC will immediately undertake to negotiate a mitually satisfactory method of apportioning and paying such costs. The respective AEC and Navy prime contracts with Holmes and Narver will UNCLASSir

Select target paragraph3