Brig. General Alfred D. Starbird -7T- cae accident occur in future operations had we not made every effort to obtain approval for the use of Taongi. The planned utilization of Taongi, if for HARDTACK, obviously calls for prompt consideration and approval. Much of the con- struction effort would require “crash” scheduling. Costs would be proportionately high. Consequently, values that can only be determined at the IMA and Commission level lead to decision. Should your office consider favorably the use of Taongi, it is recognized that its ultimate approval will not be immediately available, and the following recommendations are submitted on this assumption. Recommendations: 1. It is recommended that this office be directed to obtain the detailed review and comments of all major participating agencies of the UCRL proposal for ultimate consolidation and submittal to the Planning Board for its consideration. 2. 3. It is recommended that all Pacific test participating organizations be directed to proceed with their planning of HARDPACK on the basis of the use of Taongi.. It is recommended that AIO proceed with joint surveys; arrangements for a temporary weather observation station at Taongi; procurement of common use materials; exploration of availability of a suitable diagnostic ship; and preliminary plans and estimates for its procurement and reconfiguration; preliminary arrangements for its reactivation and docking at suitable location. It is felt that ALO must proceed with all possible action on the supposition that DMA and Commission approval will be received. We shall execute any further desired action on your advice. Enclos closure: Cy 1/16A UCRL ltr ata 2/19/57 w/cy 1/20A Proposal CC: Dr. A. C. Graves, IASL, cy 3/98 Dr. G. W. Johnson, UCRL, cy 4/9A P. W. Ager, Asst Mgr for Adv Plan, cy 5/9A DMA, cys sp & oat M&R, cys 5/9A & 7/9A Test, cys 3/9A & 9/9 . A\ Y 4

Select target paragraph3