Notes on Mtg, 25
VII.
Aug '51
SUMMARY OF CONCLUSIONS
als
:
ary
DELETED
.
_
a
Oy.
LETED
ce
|
|
|
ai ae
already exist there and at least six months of construction could probably
be saved.
|
3.
A shot in June, 1952 at Enivetok is not out of the question,
either logistically or from the point of view of measurenents. It will
require, however, that work start elmost immediately and proceed rather
faster than a normal pace.
4.
The actual time for the operation will be settled in a Division
Leaders' Meeting in September. In the meentinc, J-Division will start
an investigation of the logistic problems involved in a wholesale
evacuation of Kwajalein3 they will also do what is possible in the way
of getting the measurements program started.
Notes Edited by:
We EB. Ogie/ajw/ek