Orientation of Station 103 ~ Olive
26 September 1953

DATE:

| C

Veen”“tT

¥

Because of an error in surveying which did not show up in checking

the Field notes, Station 103, Olive, has been constructed on an

azimuth which is in error by 12° ~ 50! - 36". The axis of the Station
now lies on an azimuth of 271° - lot - 34.0" instead of 284° + OLt.~

10.¢" as called for on the site plan (DiG. 2254-00-17),

working point is in the correct location.

The

+o

This error was discovered Sept. 18, 1953, and the following day

2. A. Boettcher consulted Norm Littrell and Jamie Shumvay of ALO
to determine the significance of the change. These centlemen stated
that so far as the use of the building was concerned, the rotation

vould make no difference, and since the station is an earth covered
blockhouse, it is hoped that there will not be a structural problem.
Unless other instructions are received from tie Home Cffice, we will

assume that the station is satisfactory as constructed.

Cvery possible measure is being taken to prevent the recurrence of
Such an error.

BEST COPY AVAILABLE

“~

a

A.Lhe.
ol
H. L. Dietze
Lo
y
resident sin;ineer

ALD si shiv
ce:

HO Chrono

“

ina

a0

Re 3c
ATOMC
3cé & 470%
COLLECTION

OL rentral
Engrs(2)
OS
y
Surve

BOX No, 129624 (608) Alb334
© SURVEYS
FOLDER Aves 4

ga

ft

MATIOWAL ARCHIVES

=[0
PACIEIC SOUTHWEST REGION
REPOSITORY

HO Central
OS Chrono

rf; foes

|

S
ENERGY COMMIT
(SS1OM

326 -6S var70

1953 CN

noeetennermetNP
RT MNAT TeePe"AT}

An

creeaOTTI

At ety

—
DEPARTMENT OF ENERGY
RENTnna
GY TECLASSICATION
ELAS
TactWHEANEW A SHOIEED BY. | 5
6 COREL BE PAS)
. ee

'

|1

ASV EWE

| MAME:

| DATE

4

Jf

WTRALT

ei

EIE TY

TD
SP TREE
iF
Bh
eai
> vn

-

m1.

Bee
eee

aeee 1
tnetige dak fp Apne OrtA

,

fle!

;

—_—

Select target paragraph3