At. 3:35 p.m, the Chairman left the meeting; Dr. Buckley presided in
his absence.
-
The latest increases in estimated cost of Li-6 are due to troubles
with the stirrers and the baffles of the Flex process.
Dr. Libby asked
why the cstimated cost of the new plant showed the same unit cost for Li-6§
as the first plant, instead of reflecting any improvements.
Dr. Pittman
said the figure was the best budget estimate that could be given at the
moment, but that the plant would probably cost less than the estimate.
With respect to tritium, General Fields said that an enriched loading
Tritium
will soon be made in the DR pile at Hanford, that the excess reactivity in
Production
the first two Savannah River reactors will be used for tritium production,
and that the third one is to be fully enriched (operation in about a year
from now).
The following are targeted yearly production figures for -
tritium:
or vray
ibe bee
cee SN
At 3:40 p.m. the Chaimnan returned.
General Fields said it is hoped to accumlate field data on logistics,
necessary handling facilities, etc., for boosted implosion weapons,
There
an
exists a requirement for a limited number of
re
Thermonuclear
weapons could use up most of the projected tritium production,
The FY 54
tritium figures are essentially decisions, the FY 55 figures will be, those.
for FY 56 are tentative.
General Fields felt the figures were not too high,
wee
DOT ARCHIVES
plegeret
.
7
-
-
- 59