YVONNE TO BE DUG BY 9 FEBRUARY AND SAMPLED BY 13 FEBRUARY.
OOsPyM

BT
#00350

5001179

2
a

|

aly

|

FequIPMENT NEEDED TO START PIT SAMPLING IN THE CONTAMINATED AREA
FoF YVONNE. ALSO THIS DATE ANOTHER BACKHOE OPERATOR ARRIVED FROM
‘iy a. EQUIPMENT FOR DUST CONTROL WASTESTED AND ALL TANKS FILLED.
‘ow 5 FEBRUARY THE HOT LINE FACILITY WAS COMPLETED AND THE
‘DIGGING OF SOIL PITS wITH THE USE OF ANTI C PROTECTION BEGAN, EIGHT
'PITS WERE COMPLETED THIS DATE. THERE HAVE BEEN MINOR DIFFICULTIES
WITH ONE BACKHOE AND WITH ALPHA INSTRUMENTS. THE gRRAY OF SOIL
PIT LOCATIONS wAS EXTENDED THIS DATE TO A POINT NEAR CACTUS CRATER.
THE CLOSE GRID FIDDLER SURVEY GAVE USEFUL RESULTS AND CERTAIN SOIL
PIT LOCATIONS WERE DETERMINED CONSIDERING THIS NEW INFORMATION.
SOIL SAMPLING IS TO BEGIN ON NORTH YVONNE ON 6 FEBRUARY. SHORT
OF ANY UNFORESEEN DIFFICULTIES WE EXPECT THE SOIL PITS ON