PRIVACY ACT MATERIAL REMOVED
NN

clothing picked up approximately 10,000 c/m, although their bodies received no
contamination.

Tape and tar paper devices were placed at measured distances

for fallout detection.

Air and dirt samples were gathered.

The tests may

continue during the early portion of January.
5.

The experimental accelerator "Columbus" functioned for the first

time, as far as neutrons are concerned, on December 8 using a 3 mev DD reaction.
6.

The use of respiratory equipment at DP West is being investigated

by members of Group H-5.

Suitable types of respirators to be worn by plant

personnel will be recommended following this investigation.

An order has been

placed for 100 MSA Comfo respirators with ultra filters, which will probably
replace the Willson 750D,
7.

.

.

MSA Multi-Use masks are being worn at all times in the 20] Evaporator,

Unloading and Incinerator Rooms and in the 213 Unloading, Dissolver, and Evaporator Rooms at DP West.
8.

The ventilation system in Building 5 at DP West is being checked by

members of Groups H~5 and CMR-AE,

Several over-tolerance air-borne contamination

counts have been recorded in this srea which are believedduefoSnadeqlale7
Classification changed

by aulhor:

ventilation.

to

we" U.S. Se Aus

Sebago

Per

Zz

an J

III, GROUP H-3, SAFETY (Roy ReidotS*EetuSey-!™ ND (pase)
A,Accident
Record

By

tL LE

Man-hours Worked

pS

Number of Disabling Injuries
Number of Days Lost Time
. ¢
vo
Frequency (Accidents per 1,000,000 Man-hours)
Severity (Days Lost per 1,000 Manhours)

B,

OL t/7F

(Signatgee of penn.Dee date)

5,056,698

24,
' 6,522
4.7
1.29

1953

5,319,125

17
182
3.2
0.03

Industrial Accident Exverience
1.

On November 15, .

» ENG-3, received a strain and

contusion of his left shoulder when he caught a pipe to keep from falling through

the ceiling at the Physics Building.

8

Lost time was 6 days.

wa

&

\ cS

,

tL

ae

Select target paragraph3