omenag|
$6, 933, 121 program; and a program for construction of facilities for AFSWP, .costing
$6,421,000 in AEC funds. Sandia construction as presently planned will be practically completed in April 1954, Value of the total AEC Sandia physical plant is $41, 699, 760.
(Details of housing area and of joint AEC-AFSWP maintenanceactivities are given
in Chapter IV.)
:
Other facilities operated by Sandia Corporation include: Salton SeaTest Base,
Westmorland, California, The Base was constructed originally by the Navy as a seaplane
base. It was taken over by the AEC in December 1947, for testing free-fall weapons in
order to obtain the aerodynamic characteristics and behavior from maximum altitude to the

Salton Sea level of 237. 2 feet below mean sea level, Priortomid-1950, a $1, 631,000 Technical
Area program and a $1, 373, 000 program for administrative and community facilities were
completed. Between July 1950 and July 1953, a total of $432, 680 was spent for new con-

struction, including a new airstrip, and relocation of facilities caused by a rising sea level.

Housing facilities are now adequate for 35 permanent employees and up to 75 scientists,
technicians, and military personnel required during test periods. Total plant value is

vate

$5, 709, 085.

Sandia Laboratory operates and maintains the Base through a resident manager,

1950 to September 11, 1953, the Sandia Field Office had two AEC representatives at the

From

Base, but their functions have now been absorbed bythefield office staff.

The continuing rise of the sea level, which has partially inundated the old airstrip,
will require protective works around the administration and housing areas and relocation
of some buildings and instrument stations. The rise is attributed to increased irrigation
with resultant drainage, and is continuing at a rate of approximately one foot a year. Tech-

bee aovewed

nical studies indicate the rise will continue over a period of years.

Sandia Contract -- The present contract will expire on December 31, 1953. The
present contract provides for full reimbursement without fee. Sandia Corporation personnel
totaled 5,406 in mid-1953.
Kansas City

Project Royal (now the Kansas City Plant) was established in February 1949, asa
prime facility for production and assembly of electrical and mechanical components, and

fuzing units, Operations are in a portion of the Naval Industrial Reserve Aircraft Plant,
south of Kansas City, Missouri. Kansas City Division, Bendix Aviation Corporation, is the
operator.
Mission of the Installation -- Logistic support of high explosives plants, inert pro-

duction, procurement and assembly, and base spares procurement.

divened

Karisas City Field Office -- It was activated in February 1949. Personne! totaled 30
in mid-1950 and 69 in mid-1953. The staff structure at that time included: Field manager's
office, 4; administration, 8; engineering, 5; production control, 7; quality control, 22; and

security, 23.

°

Physical Plant -- The installation now utilizes approximately 800, 000 square feet for
‘manufacturing, 125,000 square feet for offices, plus 225,000 square feet of yard area subleased from Westinghouse, another occupant of the Naval plant. AEC plant value is

$12, 965, 041.

-

.