“

04SST Ae
f

HP-19-rve

BEST COPY AVAILABLE

weaumaeumes
From:
To:

Via:

|

A11-4(1)

a

OhAug195%

Project Officer, Marshallese Rehabilitation Project
Director, Division Biology and Medicine, Atomic Energy Commission,
Washington 25, D. C.

2} Commanding Officer, Naval Medical Research Institute
(2) Chief, Bureau of Medicine and Surgery (Code 714C)

(3) Chief, Bureau of Ships (Code 348)
Subj:

Marshallese rehabilitation, second medical study; propoeal for

Encl:

(1) Budget

1.

In accordance with the conference held at the Atomic Energy Commission

on 12 July 1954, the second trip to Majuro ie ten atively scheduled for

February 1955.

The precise dates will be determined after the completion

of the first trip.

The second trip will be under the direction of the

Naval Medical Research Institute.

2. Twelve to fourteen personnel are needed for the team for the second
visit. It is proposed that the team be constituted of the following:

a.

From NYRI (eight personnel)
E. P. Cronkite, CDR, MC, USH

N. R. Shulman, LT, M, USS
C. R. Sipe, HM, USN
|
C.P.A. Strom, EMC, USN

W. K. Border, HMC, USN

Laboratory technician)

Medical officer
Photographer

b.

to be designated (as available)

From USNRDL (four personnel)
Medical officer

)

3 laboratory technicians) ‘© © designated

c.
RtereaR

Bwana

uss Hen To

Soe ma- ras 2-10-99

From Mine Countermeasures Station, Panama City, Florida

J. &. Otto, HMC, USH

Robert Johnson, Cagt@in, MC, USA
Location

Folder

SAN BRUNO FRC

TLE ~
(9S4

AORAGE

Select target paragraph3