-l¢-
Cctober 1, 1
\O
wn
>
J. SB. Law, cr.
Chanter IV - Eniwetor Oreretions Cont.
3.
YAG Lh. Participation Cont.
3.
svent No. 3 Cont.
June Cont.
169 - Survey of
Navy personnel who had performed decontamination
work by Firehosing(27F, CP)
coveralls - 1 to 8 rrads/hr.
sioes -
to 8 -rads/hr.
sin - less than 1 mrad/hr.
a
Gea
1995
mrads
Beta
1525
rrads
Total
2629
ly TE teoarvit the radiation control of INDE -rojects was vary
~ the nature and magnitude of the operation.
Sion I raceived from MPDL :zerle was axcellent.
The cccrerce
SAY Rory.
as far as TU-7 monitoring was concerned, they appeared to be onlr 2s gocd
as the
civilians we supplied them.
I was pleasantly surprised at how
yell the Navy Yards versonnel performed, which would seer to indicate
that ths training ther received was more effective than we tnought? at
the time.
’
. Z ~ Uphe. ao
Ll VY. Barker