CHAPTER Il, SECTION 3
STATION:
PURPOSE:
SITE:
USER:
72.01
Telephone and Signal
Terminal
Janet
EG&G
PARTICIPATION: 4 and 23
CONSTRUCTION: 1-9-56/6-6-56
Existing GREENHOUSE Station 69 was
rehabilitated and known as Station 72.01 during
this Operation. This rehabilitation primarilly
consisted of electrical work. A safety switch was
relocated, and conduit and a new main panel
with 50-amp IP breakers were installed. Power
was supplied from two 5 KW gasoline engine
habilitated and identified as Stations 110 and
111 for REDWING. The replacement of fill,
metal
corrosion
preventive
measures,
and
power were required. Power was supplied by a
5 KW, 110 V, 60-cycle, single-phase generator
Timing signals and blue boxes were provided.
STATION:
112.01
PURPOSE:
Pressure Versus Time, on
Ground
Charlie
SITE:
USER:
DOD-1
PARTICIPATION: 18
This station was a self-recording gage in a
generators located outside of the station.
ground baffle and was used for measuring press-
STATIONS:
PURPOSE:
78.01 and 78.02
Release Tone System
ed and installed. The Contractor furnished and
set one survey reference stake at a location
within the target area of Station 18.
SITES:
USER:
PARTICIPATION:
CONSTRUCTION:
Elmer-Nan
TU-4, Sandia Corporation
18 and 19
4-4-56/4-7-56
PURPOSE:
Antennas
These stations were a pair of User-furnished
antennas. Antennas for 78.01, Elmer, were
mounted at the 50’ and 30’ level of Station
79.01 and antennas for Station 78.02 were
ure versus time. All equipment was User-furnish-
STATIONS:
113.01 thru 113.11
Pressure versus Time and
velocity versus Time at
SITES:
Charlie-Dog Reef, Dog,
Able and Man-Made
Islands.
DOD-1
18
2-27-56/4-23-56
4-21-56
mounted at the same levels on a pole located
USER:
PARTICIPATION
CONSTRUCTION:
OCCUPANCY:
cable was required.
These stations consisted of pipe columns
bolted to anchor bolts embedded in heavy con-
near Station 70, Nan. An RG 8/U cable extended from the antennas to Station 70, Nan, and
Station 71, Elmer. No power for the signal
STATIONS:
PURPOSE:
SITES:
USER:
PARTICIPATION:
79.01 and 79.02
Receiving Antennas
Elmer-Nan
TU-10 (LASL)
5, 6, 7, 10, 11, 13, 23, and
25
CONSTRUCTION: 4-4-56/4-7-56
These stations consisted of User-furnished
antennas. Station 79.01 was mounted at the top
of a 75-foot pole, and Station 79.02 was mounted
at the 125-foot level of the leg of the Station
70 tower. RG 8/U cable was run from the an-
tennas to Station 71, Elmer, and Station 70,
an.
STATIONS:
PURPOSE:
110 and 111
Diffraction Measurements
SITE:
Uncle
USER:
PARTICIPATION:
CONSTRUCTION:
OCCUPANCY:
(P.V.S.T. Gages)
DOD
22
3-7-56/5-5-56
3-28-56
CASTLE Stations 300 and 310 were rePage 2-60
Figure 2-44.
Station 113.06 - 45% Complete