4.6.9

Miscollancous Information from othcr Programs
See Tab E~16.

4.7

Manpower Requirements
.7e1

Pre-test Statesids
Sec Tab E-17.

4.7.2 On-site Technical
See Tab E-17.

4.7.3

On-site Military
Sce Tab E-17.

4.7.4

FPost-test Stateside
See Tab E-17.

4.8

Shipping and Transportation
4.8.1

Shipment to Site
All instruments and cquipment associated «ith program

6.le will be shipped to the sitc aboard ABLE and BAKER, with most of the
equipment on BAKER in proportion to the number of instruments thereon,

4.8.2

Personnel to and from Site

Part of the personnel will accompany the transits to the
sitc, and the remainder will go by air. All personnel vill rcturn by
air. Sec Tab E-17 for details.

4.8.3 Active Sample Air Shipment
See schcdule in Tab E-18,

4.8.4 Rollup Shipment

ST. LQUIS FRC

All equipment othcr than active samples previously shipped
by air vill return on ABLS and BAKER.

L.9

Costs
Sec Tab E-19,

9

2

19

Select target paragraph3