4.2.1.5 All the instruments associated with Project 6.he

will be operated at once for a minimum of eight hours during a sea trial.
Afterwards each instrument will be examined, and its mechanical performance
during the test will be assessed. Under these conditions, mechanical
weaknesses should be disclosed and corrected.
4.2.1.6 Any experimental work left uncompleted at the
time of departure of the ships for the site must be completed by Project
6.4e personnel aboard the ships prior to arrival at the test site.
2.1.7
2.2

Additional details will be available in Tab E-9.

Operational
4.2.2.1

Shipyard workers from San Francisco Naval Ship-

yard will be required to install instruments aboard the ships. Once
installed, air samplers will receive final adjustments from Project 6.he
personnel.

Except for a few cases, none of the instruments need be

moved from their initial installation points.

The exceptions include

several air samplcrs in the boiler air system and several clock-wound

recording instruments.

h.2.2.2 Practice recovery operations will be attempted
on all instruments and duct sections, Their recoveries will be timed in
order that close estimates may be made of:
a.
operations after each shot.

How many teams are needed for recovery

b. How many samplcs each time should recover
and how many discrite operations must be performed by each team.

complete its recovery.

4.2.3

c. How much time each team will rcquire to
For results and details, sce Tab E-10.

Instrument Check-out and Maintonance
See Tab E-9,

4.3

Post Test Work at USNRDL
4.3.1

For Project 2.6a analyses of samples, scc Tab E-ll.

4.3.2 On the basis of the results from radiochemical analyses
of duct sections, standards will be prepared to calibrate the counting
results of the air samplers and duct sections in tcrms of disintecgrations
por minute. Sce Tab E-11.
mee

el.

SFRO
Fi
ST, LOUIS

Equipment Requirements

Equipment will include sparc parts for all instruments installed
by 6.4c, hand tools, testing cquipment, and miscellancous items included

7